Plant Templates
Workshop equipment operation and materials handling: drill presses, grinders, tools, welding gear, forklifts, cranes and trolleys.
Download this cluster as a ZIP (572 KB)
9 files. Click Download on any file — no account needed.
Forks, mast, tyres, brakes, horn, leaks and load plate — the pre-use checklist here walks through them before every shift.
Yes. Portable grinders have their own risks — discs, guards and sparks — so they get their own operating procedure rather than sharing a generic tools sheet.
Safe use of hydraulic lifting trolleys: load limits, inspection before use, and movement of heavy parts in the workshop.
Related: Safety & Risk Management | Permits, Isolation & Contractor Safety | Scheduled Maintenance | Engine Overhaul & Internals — and the calculators and blogs.