Plant Templates
The core risk documents every plant needs before work starts: how hazards are identified, assessed and controlled, and the forms that record it.
Download this cluster as a ZIP (185 KB)
7 files. Click Download on any file — no account needed.
Hazard Identification and Risk Assessment: a structured way to list hazards, judge risk, and record controls before work starts. The HIRA template here follows that pattern.
The template assesses one job or area; the register tracks all assessed risks, owners and review dates in one place.
Yes. Every file downloads in Word or Excel so you can add your logo, numbering and site details.
Related: Permits, Isolation & Contractor Safety | Scheduled Maintenance | Engine Overhaul & Internals | Cooling, Lubrication & Fuel Systems — and the calculators and blogs.