Plant Templates

Permits, Isolation & Contractor Safety

Permit-to-work, lockout/tagout, working at height, manual handling and contractor control — the procedures that govern who may do hazardous work, and under what controls.

Download this cluster as a ZIP (194 KB)

9 files. Click Download on any file — no account needed.

Safety Permit To Work DOCX 40 KB Download
Safety Lockout Tagout DOCX 24 KB Download
Safety Working At Height DOCX 25 KB Download
Safety Work At Height Risk Assessment DOCX 13 KB Download
Safety Manual Handling DOCX 25 KB Download
Safety Manual Handling Assessment XLSX 7 KB Download
Safety Contractor Safety DOCX 26 KB Download
Safety Contractor Safety Inspection DOCX 22 KB Download
Safety Bulk Chemical Unloading DOCX 22 KB Download

Frequently asked questions

What does a permit-to-work control?

High-risk jobs such as hot work, confined space, electrical and lifting work, by requiring authorisation, isolation and checks before work starts and after it ends.

What is lockout/tagout?

Isolating energy sources — electrical, pressure and stored energy — and locking them off so equipment cannot be started while people work on it.

Do the contractor forms cover visitor safety?

The contractor safety procedure and inspection checklist cover contractor work, induction and site rules for non-employees.