Pump & Fan Calculator — Affinity Laws & Power

Two tools in one: what happens to flow, head and power when the speed changes (the affinity laws behind every VFD business case), and the shaft power any duty point actually demands.

A — Affinity laws: rescale a known duty point by speed

B — Shaft power from a duty point

The Calculation, Explained

The affinity laws

For a given centrifugal machine, the flow coefficient and head coefficient stay constant when speed changes — the velocity triangles remain similar. From that single fact:

Q ∝ N   |   H ∝ N²   |   P ∝ N³

The cube law is the whole economics of variable-speed drives: 20% less speed is (0.8)³ = 51% of the power. The same laws apply to impeller diameter changes (approximately, for small trims) and, for fans, density enters directly: fan pressure and power are proportional to gas density at constant speed and volume flow.

Shaft power from first principles

Phydraulic = ρ g Q H   |   Pshaft = ρ g Q H / η

Lifting Q cubic metres per second of fluid of density ρ through H metres costs ρgQH watts of hydraulic power; the machine's efficiency decides how much more the shaft must supply.

Assumptions and applicability — including the classic trap

Worked example (the defaults above)

A pump delivering 500 m³/h at 60 m on 95 kW, slowed from 1,480 to 1,200 rpm (ratio 0.811): flow = 500 × 0.811 = 405 m³/h; head = 60 × 0.811² = 39.5 m; power = 95 × 0.811³ = 50.6 kW. Cross-check from first principles at the original duty: ρgQH = 1000 × 9.81 × (500/3600) × 60 = 81.8 kW hydraulic; at 86% efficiency, shaft = 95.1 kW — matching the nameplate point, as it should.

References

Standard turbomachinery similarity theory; Hydraulic Institute standards (ANSI/HI) for affinity-law application and rotodynamic pump terminology.

Pair with the Three-Phase Motor Calculator to turn shaft power into motor current.