Shaft Alignment — Shim Correction Calculator

Rim-and-face readings in; exact shim packs and lateral moves at the front and rear feet out. The geometry every alignment crew does on paper at 2 a.m. — done here, with the sign convention stated in the open.

Sign convention (vertical): rim TIR positive = movable shaft reads high at the coupling; face TIR positive = gap wider at the top. Results: positive = add shims / for horizontal, move toward the reference side marked on your sketch. Read the convention section below before trusting a sign.

The Calculation, Explained

The geometry

Two dial readings describe the whole misalignment. The rim reading (TIR) is twice the parallel offset between the two shaft centrelines at the coupling. The face reading (TIR across the dial's sweep diameter) is the angularity — a slope, in mm per mm. If you know the offset at the coupling and the slope, similar triangles give the correction at any distance along the machine:

Offset at coupling = Rim TIR / 2   |   Angularity = Face TIR / Face diameter
Correction at a foot = Offset + Angularity × (distance from coupling plane to that foot)

Apply it at the front feet (distance X) and rear feet (distance X + Y), in both planes. The vertical result is a shim pack; the horizontal result is a lateral move. Negative means the reverse: remove shims, move the other way.

Sign convention — the part that ruins alignments

Assumptions and applicability

Worked example (the defaults above)

Vertical: rim TIR +0.10 mm → offset +0.05 mm; face TIR +0.15 mm over 150 mm → slope 0.001 mm/mm (0.10 per 100). Front feet at 250 mm: 0.05 + 0.001 × 250 = +0.30 mm of shims. Rear feet at 750 mm: 0.05 + 0.001 × 750 = +0.80 mm. Horizontal readings (−0.06 rim, −0.09 face) give moves of −0.18 mm (front) and −0.48 mm (rear). Shim the vertical, move the horizontal, re-measure, and expect the next pass to be a fraction of the first — that convergence is how you know the convention held.

References

Standard rim-and-face method as taught in machinery alignment practice (e.g. Piotrowski, Shaft Alignment Handbook); tolerance guidance per ANSI/ASA S2.75 and OEM coupling documentation.

Related reading: Inside a 60,000-Hour Overhaul — where this arithmetic earns its keep.